|
Home >
Case Studies >
New Construction
New Construction
- Arizona Public Service - Cholla Steam Electric Station
- As a part of environmental upgrades at the Arizona Public Service Cholla Plant, APS installed a wet-scrubber system which necessitated retro-fitting the Unit #1 chimney to accommodate the operational changes.
- PEI Power
- The recent increase in power generating demands has resulted in a surge in construction of Gas Turbine Power Systems at new and existing facilities throughout the United States.
- Lehigh Cement
- The installation of new kilns at the Lehigh Cement - Allentown Plant required the installation of two new waste exhaust gas stacks at the facility. The 230' tall steel stacks were a dual wall design.
- Jamestown Utilities
- Like many smaller municipal power generators, Jamestown Utilities was faced with the challenge of meeting increased generating demands for their clients. Their solution was the construction of a new plant powered by a Deltak HRSG unit.
- NYC Department of Corrections
- The Keyspan Energy Utilities Upgrade Project at the Rikers Island Correctional Facility included requirements for replacing and/or retrofitting existing boilers, installing new ductwork and erecting a new steel stack.
|