|
New Construction |
Home > Case Studies > New Construction > Arizona Public Service Arizona Public Service - Cholla Steam Electric StationJoseph City, Arizona Stack Liner InstallationChimney Description: 250' Concrete Chimney As a part of environmental upgrades at the Arizona Public Service Cholla Plant, APS installed a wet-scrubber system which necessitated retro-fitting the Unit #1 chimney to accommodate the operational changes. The structure, a 300’ tall reinforced concrete chimney equipped with a corbel brick lining, was modified and an Incoloy 27-7 Mo liner was installed. The scope of work for the project included:
|