brick liner construction
WPS - Westwood Generation
Inspection identified severe cracking, hazardous conditions, and potential lining failure situation. Demolish and removal of (5) sections of the corbel brick liner. Re-construction of the liner with new acid-resistant corbel brick liner sections.
National Grid - Northport
Remove and Rebuild Upper 15’ section ASTM 980 Acid Brick Liner. Remove and replace the Stainless Steel liner hood. Exterior crack repairs.
Florida Power & Light Company
Working in conjunction with Doe Run Peru and Fluor Daniel, CCI, and Jansons Gibraltar performed an inspection of the massive structure.