brick liner construction

 

WPS - Westwood Generation

Inspection identified severe cracking, hazardous conditions, and potential lining failure situation. Demolish and removal of (5) sections of the corbel brick liner. Re-construction of the liner with new acid-resistant corbel brick liner sections.

Learn More

 

National Grid - Northport

Remove and Rebuild Upper 15’ section ASTM 980 Acid Brick Liner. Remove and replace the Stainless Steel liner hood. Exterior crack repairs.

Learn More

 

Florida Power & Light Company

Working in conjunction with Doe Run Peru and Fluor Daniel, CCI, and Jansons Gibraltar performed an inspection of the massive structure.

Learn More